Required Skills: Duration: One plus years - 2010
Description:
- Resource plans, implements, tests, documents, and maintains solutions for the integration and testing of in-house developed and COTS/GOTS (Commercial Off The Shelf) components, elements, subsystems and/or systems.
- Establishes functional and technical specifications and standards, solves hardware/software interface problems, defines input/output parameters, and ensures integration of the entire system or subsystem.
- Reviews, evaluates and derives requirements for testability, develops and directs preparation and execution of comprehensive test plans, procedures and schedules for complete systems and/or subsystems.
- Coordinates subsystem and/or system testing activities with programs and other organizations.
- Performs analysis of test results and prepares comprehensive subsystem and/or system level valuation reports which verify and validate system performance.
- Writes discrepancy reports and performs integration regression testing to verify/validate incorporated fixes to software, components, subsystems and systems.
- Test activities will include documenting and executing tests for Key Entry applications, Quality Assurance algorithms and other applications.
- Interface directly with customers and external entities on test-related activities.
- Know the difference between testing on a MS-Windows platform and testing on a UNIX platform and how to integrate the two platforms.
0 Fast paced-environment.
- Team oriented.
Can be W-2 Hourly or a 1099 Independent Subcontractor status.
If you are interested, please send an updated WORD version of your resume to:
btinley@technicalsg.com
Travel:
|